Let’s Talk
Get in touch, tell us more about your business goals, and learn how TEAMWRKX can help you achieve your construction needs. Our office hours are 7AM to 5PM PST.
Text Us Now

Interior renovation included three distinct areas: the Dining Lounge, the Wine Room, and the Cellar.  The finished spaces have an ambiance akin to an underground wine cellar complete with rock finishes, cozy banquette nooks and rustic wine country tables.

We began by gutting the entire space and installing new MEP and framed infrastructure to facilitate the new designs, such as the new seating locations and layouts (including rock wall feature behind the bar). The bar’s wall has recessed shelving with lights illuminating the wine bottles and adding more warm light to the space. The more cavernous features are accented by rocklike features made from sanded mortar and colored with earthy colors. While this is a wine cave, it is well illuminated and is a space that can host several dozen people. In addition to the new spaces, we also completed an extension of the bocce pit with built-in fire pits. This is a great, warm atmosphere that does well for meetings, parties, weddings, and all other celebrations.

Project Story

Permitting the project posed a significant challenge, specifically upgrading the clubhouse to be ADA compliant. Instead of being able to provide an upgrade to specific parts of the clubhouse, design and building scope was added to the balance of the clubhouse, causing an increase in price and time.

Project Challenges
City Permits/Approvals
Complex Permitting
Tenant Occupied
Value Delivered

Our team clearly communicated problems to the client and worked to ensure permits were expedited where possible. Multiple revisions were made to pricing and construction to facilitate the pre-construction difficulties the project faced. The penultimate solution was physically building the finished product, which went quickly as a result of significant due diligence spent in the pre-construction phase.

Featured Teammate
Featured Teammate
Eric
Venzon
Principal
"It was a pleasure to build this exciting space for The Club at Ruby Hill. Our scope was to renovate their dedicated member space lounge and bar into a charming space resembling an underground wine cave. This tenant improvement involved fast-paced construction in a luxury environment, and our aesthetically clever finished product was well received."
3,500 SF
Campbell, CA
Interior tenant improvements of Opa! in Campbell included stone walls, wood beam soffits, hand painted ceilings, etc.
4,100 SF
San Jose, CA
Fast-track tenant improvement from shell to grand opening within three months.
529 rooms in 2 phases
Fremont, CA
Interior renovation of a comprehensive multi-phase fast-track occupied renovation including over 500 rooms.